- Mejora la calidad y confiabilidad del suministro de energía eléctrica.
- Aumenta la capacidad de transmisión hacia las áreas Centro, Occidente y Oriente del Sistema Nacional Interconectado (SNI).
- Promueve el crecimiento del sector industrial y procesos productivos de la región, derivado del acceso a la red de transmisión de energía eléctrica.

Pacific South Ring (APS)
The Pacific South Ring (APS) is the first fully integrated electric power transmission project in Guatemala to reach 100% commercial operation. Its design, construction, and energization were carried out as a self-initiated project, approved by the National Electric Energy Commission (CNEE). The APS is part of the Transmission System Expansion Plan 2012–2021, representing a major milestone in the development of the national electric grid.
Status: In commercial operation since 2018.