Modesto Méndez Project

Modesto Méndez Project

The Modesto Méndez substation will increase the reliability of the transmission lines and substations that will be connected to it.
  • The voltage levels in the transport system will increase, thus improving the quality of service, not exceeding the limits established in the applicable technical standards.
  • In general terms, a significant reduction in power losses in the system will be experienced, reducing the operating costs of the system.
  • The construction of the project began in 2022 and it is expected to begin its commercial operation in 2024.

More projects

We transport development and improve lives with sustainable and competitive energy.

South Pacific Ring -APS-

The design, construction, and energization of the South Pacific Ring -APS- meant for Guatemala the commissioning of 100% of the first complete and comprehensive electricity transmission project, approved by the Comisión Nacional de Energía Eléctrica (CNEE), held on its own initiative and part of the Transport System Expansion Plan 2012-2021.

View project ›