- The voltage levels in the transport system will increase, thus improving the quality of service, not exceeding the limits established in the applicable technical standards.
- In general terms, a significant reduction in power losses in the system will be experienced, reducing the operating costs of the system.
- The construction of the project began in 2022 and it is expected to begin its commercial operation in 2024.

Multi-stage Reactive Compensation Equipment
These systems were identified as part of the effort to expand electric transmission capacity, with the goal of mitigating network constraints and providing greater operational flexibility to the Wholesale Market Administrator (AMM). Their integration directly contributes to enhancing the efficiency and stability of the national power system.
Status: In commercial operation since 2022.