- The voltage levels in the transport system will increase, thus improving the quality of service, not exceeding the limits established in the applicable technical standards.
- In general terms, a significant reduction in power losses in the system will be experienced, reducing the operating costs of the system.
- The construction of the project began in 2022 and it is expected to begin its commercial operation in 2024.
Interfaz substation
Interfaz 230/34.5 kV substation is our first work in which high voltage interacts with a transformation aimed at the end user, maximizing the existing infrastructure of the National Interconnected System, improving what the end user perceives about the quality regarding voltage and power outages.